Description

The Bitmain ANTRACK AR31 is a high-density 200 kW Hydro mining system built around a standard 47U rack for modular professional mining deployments. It supports up to 20 Antminer U2 Hydro miners or 14 traditional Hydro miners and operates with a dedicated standalone dry cooler in an independent closed-loop configuration. Designed for data centers, mining farms and scalable industrial installations, the AR31 combines power distribution, Hydro cooling and centralized monitoring in a single deployment platform. Next Level Corp provides local sales, deployment guidance and long-term technical support.

SPECIFICATIONS — Bitmain ANTRACK AR31 200 kW
Manufacturer Bitmain
Model ANTRACK AR31
Product type 47U Hydro mining cabinet with standalone dry cooler
Form factor 47U industrial rack system
Installed capacity Up to 20 × Antminer U2 Hydro miners or 14 × traditional Antminer Hydro miners
Miner maximum load 200 kW
Total system load 215 kW
Cooling system Standalone closed-loop Hydro system with dedicated outdoor dry cooler
Electrical input 380–480 V AC · 3-phase · 50–60 Hz
Maximum input current 326 A @ 380 V · 270 A @ 480 V
Monitoring Integrated digital touch panel with temperature, pressure and system monitoring
Compatible miner formats 2U server-form Hydro miners and traditional vertical Hydro miners
Compatible models (examples) Antminer L9 Hyd 2U, L11 Hyd 2U, S23e Hyd 2U, S19 Hydro series, S21 Hydro series, S23 Hydro series and other compatible Antminer Hydro models
Cabinet dimensions 1000 × 1200 × 2300 mm
Cabinet packaged dimensions 1070 × 1380 × 2400 mm
Listed cabinet/system weight Approximately 750 kg
External dry cooler dimensions 1200 × 2250 × 2300 mm
External dry cooler packaged dimensions 1250 × 2320 × 2400 mm
External dry cooler net / gross weight 550 kg / 700 kg
Dry cooler electrical input 380–480 V AC · 50–60 Hz
Dry cooler maximum current 15.8 A @ 380 V · 14.8 A @ 480 V
Dry cooler fan rated power 4.1 kW × 2 @ 380 V · 4.7 kW × 2 @ 480 V

Notes

  • The ANTRACK AR31 requires a professional 380–480 V three-phase electrical installation sized for the configured mining load.
  • Miner capacity depends on the physical format and power consumption of the installed Hydro miners.
  • The system supports up to 20 U2-format Hydro miners or up to 14 traditional vertical Hydro miners.
  • The standalone dry cooler creates an independent closed-loop cooling system without requiring a centralized cooling tower during normal operation.
  • Verify transformer capacity, electrical distribution, protection devices, grounding, installation space and cooling clearances before deployment.
  • Final miner compatibility should be confirmed before installation, particularly for future or non-standard Hydro models.
  • Two freight options are available: Air Freight with an estimated 15-day transit time and Sea Freight with an estimated 45-day transit time.

Your purchase includes (Next Level Corp)

  • Pre-installation compatibility and deployment guidance.
  • Guidance for electrical, cooling and rack installation requirements.
  • Configuration assistance for compatible Hydro mining equipment.
  • Remote technical assistance during setup and commissioning.
  • Pool and wallet configuration assistance for installed miners.
  • Lifetime 24/7 technical advice.
  • Genuine spare parts and compatible Hydro accessories available for sale.
  • Local service and technical support in Bolivia.
  • Manufacturer warranty according to the applicable equipment and purchase terms.
SHIPPING
This product is available with two freight options: Air Freight or Sea Freight. Select the preferred shipping option above to display the corresponding price and estimated delivery time. The Sea Freight option includes maritime transportation to the nearest destination port in the customer’s country.
DELIVERY
Estimated transit time is approximately 15 days by air or 45 days by sea, depending on the selected shipping option. Sea freight delivery is made to the nearest destination port; inland transportation from the port to the final installation site is not included.

Important Notice:
The ANTRACK AR31 is industrial mining infrastructure and requires appropriate three-phase electrical capacity, installation space and professional commissioning. The 200 kW specification refers to the maximum supported miner load and is not the hashrate or power consumption of an individual ASIC miner. Shipping price and delivery conditions depend on the freight option selected during purchase.

Tags: ANTRACK, ANTRACK AR31, Bitmain ANTRACK, Hydro, Hydro Mining, Minería Hydro, Rack de minería, Gabinete de minería, Mining Rack, Mining Cabinet, 200 kW, 47U, Dry Cooler, Enfriamiento Hydro, Refrigeración líquida, Sistema de refrigeración líquida para minería, Data Center, Centro de datos, Antminer Hydro, Antminer 2U Hydro.

Additional information

Shipping Option

Air Freight — 15 Days, Sea Freight — 45 Days

Reviews

There are no reviews yet.

Be the first to review “Bitmain ANTRACK AR31 200 kW Hydro Cooling System”

Your email address will not be published. Required fields are marked *

USDT / BOBBs 11.83Ref. P2P Bandera de Bolivia
BTC81,856.61+1.36%
ZEC1,125.35+6.46%
XMR595.21+3.14%
DOGE0.07928+3.73%
LTC59.690+4.67%
DASH49.464+6.49%
ETC7.708+2.96%
RVN0.00144548+6.56%
ETH2,395.10+2.60%
SOL104.20+3.39%
KAS0.03475+1.50%
XRP1.301+3.22%
BNB726.57+2.90%
ADA0.21706+2.23%
ALEO0.05067-8.70%
USDT/P2P: NextWave Software · Referencial Data provided by CoinMarketCap.com